The first
plastic tie panel is done 5 April 08.
Progress Report as
illustrated in above photos:
By the end of the day, here is what we achieved:
-
Cut all the plastic into ties running 4 saws. And we had
extra saws there. Used 2 man crews with other people carrying lumber and
plastic. The 4 crews finished all the cutting in only 2 ½ hours.
-
Total cuts for 4 saws were
about 1,700.
-
Built 4 plastic straight sections + enough ties with the
tie plates on for 3 more asap.
-
Rebuilt 2 wood straight sections for the barn yards.
-
Installed 3-4 rebuilt yard switches. They may have
gotten all 4 in.
-
Worked on the new down ramp from the transfer table.
-
Cut 166 2x4 lengths into ties and saved 42 lengths for
switch repair. Those are tarped by the dumpster.
-
Trenched maybe 30 ft, 8” deep, along the west outer main
across from where the water tower is going to rebury electric signal conduit
which was heaved up above ground.
-
Dug out a mess of leaves from Russell Lake blocking the
drain pipe.
-
Ballasted outer main by the Russell Lake bridge and at
the wye bridges.
-
A crew numbered each 1.5” engine shed bay on the
overhead door. Looks nice.
Someone asked me if we are still behind.
Not for
April!
Another said to me,
"People
really want to come out to work and be active!"
Many thanks
to all of you!
--------------------------------------------------------------------------------------------------------------------------------
Back to NJLS Home
Page
© 1997-2008 by New Jersey Live Steamers, Inc. All rights
reserved worldwide.
|